Latest projects:

Belgrade City Library

Date:
February 2019.

Type of works:
Audio video system in the Roman Hall for the purposes of program activities in the city Library. Realized system comprises an audio system for speaker sound reinforcement and audio-video system for multimedia content reproduction. The entire system is automatized and does not require technical staff for operation. The project is realized in cooperation with the Acoustics Laboratory, School of Electrical Engineering, University of Belgrade.                                                                                                                                             

Church of St. Cyril and Methodius, Novi Sad

Date:
November 2018.

Type of works:
Bit Projekt, in cooperation with the Acoustics Laboratory, School of Electrical Engineering, University of Belgrade, has realized a sound reinforcement system, thereby solving a problem of inadequate speech intelligibility during church service. Specialized loudspeaker systems with high directivity were used, manufactured by Audac.                                                                                                                                             

Continental Automotive, Novi Sad

Date:
September – December 2017.

Type of works:
The realization of a structured cable system. Over 650 copper cat6a connections and Optical connecting.                                                                                                                                             

Gazprom Transgaz, Ukhta, Russia

Date:
December 2016. – September 2017.

Type of works:
The realization of a structured cable system. Over 1500 copper cat6a connections and Optical connecting.                                                                                                                                             

Endava d.o.o. Belgrade

Date:
February 2017. – May 2017.

Type of works:
The realization of a complete structured cable system. Over 2000 copper cat6a connections and Optical connecting. Moving of complete data center structure to new location.                                                                                                                                             

Banca Intesa Belgrade

Date:
October 2016. – February 2017.

Type of works:
The realization of a structured cable system. Over 2800 copper cat6a connections and Optical connecting.                                                                                                                                             

Complete reference list can be found here.

Products and Solutions