Latest projects:

Iron Gate I Hydroelectric Power Station – Ship lock, Kladovo

Date:
July 2021.

Type of works:
Sound reinforcement system for the ship lock.
In cooperation with AVC PRO d.o.o. a public address system is realized for issuing voice messages and orders in the lock and its surroundings, from the control tower. The system is composed of speaker clusters distributed alongside the lock. Speaker clusters are formed by horn loudspeakers from manufacturer Audac. The central equipment and microphone panels for issuing voice messages are products of companies Audac and RDL.                                                                                                                            

Open-space offices, Belgrade

Date:
August 2020.

Type of works:
Sound Masking System
A specialized direct-field sound masking system is designed and implemented in the office space. The system manufacturer is Cambridge Sound Management (Biamp). The system has the function of enhancing speech privacy protection in nearby meeting spaces, as well as reducing worker distraction inside the open-space office. The implementation, tuning and final acoustical measurements were performed in cooperation with the Acoustics Laboratory of the Belgrade University and Profakustika d.o.o. company.                                                                                                                                             

Residential smart home building, Cara Nikolaja II, Belgrade

Date:
2018-2019

Type of works:
System design and realization of all low voltage systems: structure cable system, CCTV, access control. Realization of high-voltage systems and complete integration of low and high voltage systems in residential units, in accordance with Crestron Smart Home standards. In each unit the following systems are integrated and easily controlled: lighting, power sockets, motorized shades, centralized heating, air conditioning, CCTV, video-intercom, and automatic garage system.                                                                                                                             

Belgrade City Library

Date:
February 2019.

Type of works:
Audio video system in the Roman Hall for the purposes of program activities in the city Library. Realized system comprises an audio system for speaker sound reinforcement and audio-video system for multimedia content reproduction. The entire system is automatized and does not require technical staff for operation. The project is realized in cooperation with the Acoustics Laboratory, School of Electrical Engineering, University of Belgrade.                                                                                                                                             

Church of St. Cyril and Methodius, Novi Sad

Date:
November 2018.

Type of works:
Bit Projekt, in cooperation with the Acoustics Laboratory, School of Electrical Engineering, University of Belgrade, has realized a sound reinforcement system, thereby solving a problem of inadequate speech intelligibility during church service. Specialized loudspeaker systems with high directivity were used, manufactured by Audac.                                                                                                                                             

Continental Automotive, Novi Sad

Date:
September – December 2017.

Type of works:
The realization of a structured cable system. Over 650 copper cat6a connections and Optical connecting.                                                                                                                                             

Complete reference list can be found here.

Products and Solutions